Skip ads and navigation
Advertising
Our network sites seattlepi.comHelp
Print thisE-mail this
Thursday meeting on Battery Street Tunnel work

Construction work to upgrade the north end of Seattle's Alaskan Way Viaduct – including major renovations to the Battery Street Tunnel – will be discussed at an open house scheduled for 5:30 p.m. Thursday (Oct. 16) at the Mountaineers Building, 300 Third Ave. W., Seattle.

The tunnel work, set to begin in the fall, will mean closures on weekday evenings and up to two weekends each month. When completed, the short on- and off-ramps at south end of the tunnel will be closed to general traffic and converted to emergency access ramps.

The work will take as long as 18 months and also will include installing a new fire alarm system, a new sprinkler system, tunnel closure signs and signals, new ventilation fan controls, and new lighting. Roof beam connections will be reinforced and an emergency exit stairwell added in the southbound tunnel.

The tunnel work is among several projects planned in advance of replacing the downtown portion of the viaduct, which the state has said it wants to demolish by 2012. Some have questioned that move.

At the Thursday session officials from Seattle, King County and the state will discuss the construction work and changes to Belltown and the surrounding area, including city paving projects, proposed changes to the Mercer corridor and bus service improvements.

Posted by at October 15, 2008 6:56 p.m.
Comments
There are currently no comments for this blog entry.

! Login below to post a comment.

Registered users, log in here
E-mail 
Password 
Remember me
 HELP! I forget my password

Unregistered users, sign up now

Or post anonymously (About this feature)

Your comment (No HTML allowed, use these special codes instead)
Violating our Terms of Service may result in your post being removed.

Special codes
  • [b]selected text[/b] -- Display the selected text in bold.
  • [i]selected text[/i] -- Display the selected text in italics.
  • [link]www.seattlepi.com[/link] -- Creates a link to the url between the link tags.
  • [link title="Seattle Post-Intelligencer"]www.seattlepi.com[/link] -- Creates a link to the url between the link tags, uses title as link text.
  • [mail]newmedia@seattlepi.com[/mail] -- Creates a link to an email address.
Enter the code shown:
What is this?
SUBSCRIBE

RSS
Headline widget

BLOGGER BIOS
photo
Ann Butler: Assistant city editor
photo
Kery Murakami: P-I staff reporter
photo
Larry Lange: Reporter
ARCHIVES
Search this blog

Recent entries
· Third runway noise meeting
· Speaking up about Sound Transit bus and rail
· Now, learning the cost of replacing the Viaduct
· Metro fare hikes approved
· Metro fare increases discussed Monday

Browse by month
Browse by author
TRAFFIC CAMS


I-5/I-90 Interchange


I-5 @ Spokane Street


I-90/I-405 Interchange


SR 520/I-405 Interchange


SR99 @ Marginal Way

LINKS

Cameras
· Seattle
· Tacoma
· Bellevue
· I-90 Bridge
· 520 Bridge
· Passes
· Ferries
· King County
· Border
· Hood Canal Bridge

Transit
· Metro (bus)
· Sea-Tac Airport
· FAA Airport status
· FAA NW airport status
· State ferries
· Cruise ships (Seattle)
· Sound Transit
· Community Transit
· Everett Transit
· Kitsap Transit
· Pierce Transit

Weather, River, Road
· Regional public info
· West. Wa. warnings
· National Weather Service
· King Co. road closures
· Real-time river reports
· School closings

Miscellaneous
· Carpool/HOV FAQs
· Construction info
· Express lanes
· Regional Transportation Investment District
· Highway closures
· Driver's license info

TRANSPORTATION FORUM
Hot topics · Newest topics
University LINK:First bids coming in below estimate, a bright sign for ST in bad economic times?
Sound Transit has put out a press release saying the contract to ...
More signs rising gas prices pushing bus Ridership up. LINK Transit, in Wenatchee sees increase
Now bus ridership in urban areas would go up when gas prices rise ...
Highway Bridges over rivers need to be raised up: Interstate 5 facing floods in Fife and Centralia
Flooding is threatening Interstate 5 at Centralia and Fife. It is ...
Hot topics · Newest topics
Albuquerque, Build First, then ask the Voters, Governor Richardson's way of funding commuter rail
As I have said many times, the reason New Mexico bought the BNSF ...
Highway Bridges over rivers need to be raised up: Interstate 5 facing floods in Fife and Centralia
Flooding is threatening Interstate 5 at Centralia and Fife. It is ...
University LINK:First bids coming in below estimate, a bright sign for ST in bad economic times?
Sound Transit has put out a press release saying the contract to ...

*Go to the transportation forum

ADVERTISING
LATEST INCIDENTS

Last update: 1/8/2009 3:46:01 PM

* I-405 NORTHBOUND JUST SOUTH OF SE 8TH ST ACCIDENT BLOCKING CARPOOL LANE VERIFIED WITH CAMERA 3:28 PM - STATE PATROL ON SCENE

** INTERURBAN AVE BOTH DIRECTIONS CLOSED AT FORT DENT WAY

** I-5 NORTHBOUND AT MILEPOST 247 RIGHT LANE CLOSED DUE TO SLIDE

** I-5 SOUTHBOUND ST MILEPOST 248 LEFT LANE CLOSED DUE TO SLIDE

** I-5 NORTHBOUND AND SOUTHBOUND RAMPS TO SR 530 CLOSED

** I-5 SOUTHBOUND JUST SOUTH OF PIERCE/KING COUNTY LINE 2 RIGHT LANE CLOSED DUE TO WATER OVER ROADWAY

** I-5 CLOSED FROM MILEPOST 88 TO MILEPOST 68

** I-90 CLOSED AT MILEPOST 34

** US-12 CLOSED FROM WHITE PASS TO JUST WEST OF RIMROCK RETREAT

** US-2 CLOSED AT MILEPOST 44

** US-97 BOTH DIRECTIONS CLOSED FROM BIG Y JUNCTION TO LAUDERDALE JUNCTION

** SR-202 CLOSED FROM FALL CITY NORTH CITY LIMIT TO FISH HATCHERY ROAD

** SR-202 CLOSED FROM SR 203 TO 356TH AVE SE

** SR-202 CLOSED SNOQUALMIE NORTH CITY LIMIT TO NORTH BEND WAY

** SR-203 CLOSED FROM FALL CITY TO DUVALL EXCEPT OPENINGS BETWEEN TOLT RIVER AND NE 55TH , AND CARNATION FARM ROAD AND DUVALL

** SR-169 NORTHBOUND CLOSED AT CEDAR GROVE ROAD (MP 19.2) DUE TO WATER OVER THE ROADWAY

** SR-410 CLOSED FROM ENUMCLAW TO GREENWATER

** SR-530 CLOSED AT LINCOLN BRIDGE NEAR ARLINGTON

** SR-530 CLOSED AT SAUK VALLEY ROAD NEAR DARRINGTON

** SR-20 CLOSED NEAR CONRAD ROAD EAST OF ROCKPORT STATE PARK

** SR-530 RAMP TO NORTHBOUND I-5 CLOSED DUR TO WATER OVER ROADWAY

** SR-20 CLOSED AT NEWHALEM

** SR-20 CLOSED AT CONCRETE

** SR-20 CLOSED FROM PREVEDELL ROAD TO EAST OF LYMAN HAMILTON ROAD

** SR-169 AT KUMMER BRIDGE BOTH DIRECTIONS CLOSED UNTIL FURTHER NOTICE

Courtesy of the Washington State Department of Transportation

*Drive times · Traffic map · Trouble spots

Advertising

Seattle Post-Intelligencer
101 Elliott Ave. W.
Seattle, WA 98119
(206) 448-8000

Home Delivery: (206) 464-2121 or (800) 542-0820
seattlepi.com serves about 1.7 million unique visitors
and 30 million page views each month.

Send comments to newmedia@seattlepi.com
Send investigative tips to iteam@seattlepi.com
©1996-2007 Seattle Post-Intelligencer
Terms of Use/Privacy Policy

Hearst Newspapers